(Mr. Bartlett served as Project Manager on this Project by Paul I. Cripe)
Mr. Bartlett served as project manager for design of this $4 million,
high-profile corporate offices building with a concrete pre-cast
warehouse and manufacturing facility. He worked with the client and
design consultants from schematic design through construction documents
and worked closely with the construction manager from early in the
design to better target costs for the 65,000-sft building. Mr.
Bartlett’s design work included architecture, site layout and interior
finishes. He was also responsible for close coordination of the full
design team (architectural, structural, MEP, site/civil).