(Mr. Bartlett served as Architecture Services Manager on this Project by American Structurepoint, Inc.)
Mr. Bartlett was added to a critical V.E. project team in development
off a solution to re-think a severely over budget project brought from
another firm. After a full week VE session, designs were revised with
significant ideas and contributions of Mr. Bartlett incorporated to
save millions of dollars. Mr. Bartlett was then retained as the
architecture services manager on the ensuing design utilizing 2
pre-cast concrete buildings which bids in July 2009 and is currently
projected at $2M under budget.
|